Utility Optimization

Peaker Plant Replacement and T&D Deferral

VRB-ESS can respond to grid conditions within ½ cycle, providing frequency and voltage support in real time, while simultaneously serving longer-duration energy needs. VRB-ESS enable utilities to balance  loads, make more efficient use of existing infrastructure and operate smart microgrids. VRB-ESS can replace peaker plants, and investments in transmission and distribution (T&D) can be deferred.

Example: Net System Load in California Drops Dramatically Mid-day Due to Increasing Solar Penetration. Storage is Needed to Balance and Stabilize.